Concrete cube & cement testing lab in Hyderabad
Prove that every pour meets its specified grade. From routine 7- and 28-day cube tests to IS 10262 mix designs and full cement testing, our digital compression testing machine gives accurate, traceable results.

Overview
Concrete quality is decided long before the slab is cast: by the cement, the mix proportions and the care taken at site. We test both the ingredients and the hardened concrete so you can catch problems early.
Our 2000 kN computer-controlled compression testing machine records each test digitally, and every accredited result is reported with the NABL symbol and a unique ULR number.
Tests we perform
| Test | Standard | Where |
|---|---|---|
| Compressive strength of concrete cubes (7 / 28 day) | IS 516 (Pt 1/Sec 1) | Lab |
| Flexural strength of concrete beams | IS 516 (Pt 1/Sec 1) | Lab |
| Slump / workability of fresh concrete | IS 1199 (Pt 2) | Field |
| Concrete mix design (M20 – M60 and above) | IS 10262, IS 456 | Lab |
| Fineness of cement | IS 4031 (Pt 2) | Lab |
| Standard consistency | IS 4031 (Pt 4) | Lab |
| Initial & final setting time | IS 4031 (Pt 5) | Lab |
| Soundness – Le Chatelier | IS 4031 (Pt 3) | Lab |
| Compressive strength of cement | IS 4031 (Pt 6) | Lab |
| Specific gravity of cement | IS 4031 (Pt 11) | Lab |
When you need it
- Routine quality control of RMC and site-mixed concrete
- Approving a new mix design before a project starts
- Checking a cement brand or batch before bulk purchase
- Client, consultant or authority submissions needing NABL reports
What you receive
- NABL test report with ULR number for accredited parameters
- Mix design report with trial-mix results
- Pass / fail comparison with the specified grade or IS limits
Frequently asked questions
Can you collect cubes from our site?
Yes. Our team can collect cubes from sites across Hyderabad, or you can deliver them to our lab at Hardware Park, Shamshabad.
How long does a mix design take?
A mix design needs trial mixes and 7-day (and usually 28-day) strength results, so plan for roughly a month. We share early-age results as soon as they are available.
Do you test RMC concrete?
Yes. We regularly test cubes cast from ready-mix concrete for builders, consultants and RMC suppliers.
Related services
Planning a project or stuck on an approval?
Tell us what you're building and what you need to prove. We'll recommend the right tests, give you a clear quotation and schedule the work.
